地产围挡制作施工工艺

标签:地产,制作,施工,工艺 发布时间:2016年09月07日 点击575
  地产围挡制作施工工艺,你知道吗?
  Real estate enclosure production construction process, you know?
  一、地产围挡定位
  First, the real estate enclosure positioning
  根据客户下发的施工平面图或我公司自立研发的图纸,对围挡进行测设定位。放线后,与客户进行确认,与图纸不符的地方进行调整。
  According to the construction plan issued by the customer or the drawings of our company independent research and development, to test the positioning of the enclosure. After the line, and customers to confirm, and the drawings are not in conformity with the adjustment of the place.
  二、地产围挡制作立柱及板块制作
  Two, the production of real estate enclosure column and plate production
  依据深化图纸及现场测量尺寸。计算出必要制作立柱与板块的数量,在按照深化图纸的要求下料,焊接立柱及焊接板块龙骨,立柱高度为6米,用L40角钢焊接成立柱,板块龙骨采用L30方管焊接江苏人事考试信息网,在将镀锌板用铆钉连接到方管龙骨上制成板块。制作好的立柱及板块龙骨都要进行防腐处理,涂刷防锈漆。
  According to the deepening of the drawings and site measurement dimensions. Calculate the number of column and plate making, in accordance with the requirements of the drawings deepen cutting, welding and post welding plate keel, the column height is 6 meters, with L40 angle steel column was established, using L30 plate keel welded, galvanized plate with rivets in the connection to the bone plate made of Fang Guanlong. Make a good column and plate keel to be anti-corrosion treatment, brushing rust proof paint.
  三、地产围挡制作基础发掘和灌溉
  Three, the production of real estate enclosure excavation and irrigation
  基础发掘要看施工场地是否适合钩机工作,假如钩机可以工作,就采用钩机作业活动策划,假如施工现场钩机无法工作,那么就采用人工进行发掘。基础发掘完成后,进行主力柱方笼或方管的预埋,并采用c30混凝土灌溉,混凝土灌溉完成后要进行基础的保养,防止基础出现裂缝等情况。
  Based on the construction site is suitable for mining machine work, if you can work with the hook, hook machine operation, if the construction site hook machine cannot work, then use artificial digging. The basic completion of the excavation, for the main square or square column cage embedded, and the use of C30 concrete, concrete pouring is completed to perform basic maintenance, to prevent cracks etc.
  四、地产围挡制作围挡板块焊接安装
  Four, the production of real estate enclosure block plate welding installation
  待基础达到肯定的强度后,进行板块安装,焊接通横梁。悉数焊接完后,进行板块安装,将板块的所有龙骨及横梁按揭牢固,依次安装每个板块。待板块安装完毕后,绷装宝丽布画面。按客户要求进行施工,保证达到客户所要求的施工标准。
  After the foundation has reached a certain intensity, plate installation, welding through the beam. After all welding, the plate installation, the plate of all the keel and the beam mortgage firm, in order to install each plate. After the plate is installed, stretched and arranged Polaroid screen cloth. Carry out construction according to customer’s requirement, ensure the construction standard to meet customer’s requirement.
  我公司会服从商业信誉及平等互利的原则,竭诚为用户提供最精良的服务,创作更加完善的作品,诚愿与各界同伙携手奋进百度优化排名,共创繁荣。
  Our company will abide by the principle of commercial credibility and equality and mutual benefit, dedicated to provide users with the best service, create a more perfect work, is willing to work with friends from all walks of life to forge ahead, create prosperity.
相关:地产 制作 施工 工艺
上一篇:滚动楼顶大字制作广告灯箱制作需细致哪些细节
下一篇:如何做大型楼顶大字制作广告牌制作
返回 亚博体育
北京远通广告有限公司
我们的观点 Our point of view
亚博体育以质量赢得生存、以诚实守信发展客户;坚持开拓进取、务实创新、用心做事、精益求精、互利双赢的经营理念;为客户提供高水准、专业化和可操作性的多元化服务,满足客户的实际要求
相关链接 news
楼顶大字制作广告触摸屏的使用技
户外楼顶大字制作广告牌用的是什
清洗后的北京大型楼顶大字制作广
北京灯箱制作的适用范围
北京楼顶大字制作广告牌钢结构的
户外楼顶大字制作广告牌要怎么做
滚动楼顶大字制作广告灯箱制作需
如何做大型楼顶大字制作广告牌制
怎样使北京大型楼顶大字制作广告
高速楼顶大字制作广告牌单立柱设