亚博体育

当前位置:亚博体育 >> 新闻中心 >> 浏览文章

大型工地围挡的正规做法

标签:大型,工地,正规,做法 发布时间:2017年01月19日 点击582次
  大型工地围挡的正规做法你知道吗?下面小编为您讲解一下:
  Large construction site of the regular practice of the way you know? Below small make up for you to explain:
  1、根据甲方详细要求定制围挡施工方案及图纸,经甲方确认并认可。
  1, according to the specific requirements of party a customized enclosure construction plan and drawings, confirmed by Party A and recognized.
  2、观察施工现场百度网站排名,确定施工难度,排除施工过程中可能碰到的某些题目避免延误工期,尤其是排查施工现场是不否有电线河北人事考试网站,管道等可能影响施工的征象。
  2, on the construction site, construction difficulty, rule out some problems that may be encountered in the construction process to avoid delay, especially the investigation of the construction site is not any wires, pipes and other phenomena may affect the construction of the.
  3、发掘机进入现场开始挖基础,按照图纸方案标准进行挖坑。要细致地下是否有线路,管道等。
  3, enter the site to start digging excavator digging of foundation, in accordance with the drawings standards. Should pay attention to whether there is a line of underground pipelines, etc.
  4、围挡基坑挖好后,将主立柱立起开始灌溉混凝土,混凝土为凝固之前用水平尺进行主立柱校正,防止方笼倾斜,影响美观。待混凝土凝固后安装横梁。
  4, after the excavation of the foundation pit, the main column is set up to start pouring concrete, concrete is solidified before using the level of the main column correction, prevent the square cage tilt, affect the beautiful. After the concrete is solidified, the installation beam is installed.
  5、运输主立柱方笼、横梁以及板面及时到达现场。
  5, the main square column transport cage, beam and plate to reach the scene in time.
  6、灌溉完成后,等待混凝土凝固后开始上横梁,上三道横梁增强围挡的坚固程度加强抗风能力,我公司采用40方管作为材料进行焊接横梁。
  6, after the completion of water, wait for the concrete solidification start beam, three beams to strengthen the enclosure of the strong degree of enhanced wind resistance, our company adopts 40 square tube as the material for welding beam.
  7、横梁竣工后,开始安装围挡板面,我公司围挡板面采用xxx*xxx每块拼装完成打包钢带,焊接工人及时安装随后进行加固,保证我们工作的质量以及安全。
  7, after the completion of the beam, start the installation of the enclosure panel, our enclosure plate adopts xxx*xxx of each assembly is completed, the timely installation of welding workers followed by strengthening our work, ensure quality and safety.
  8、围挡画面采用上、下穿绳的方法绷装,保证画面的平整性。
  8, around the block picture using the upper and lower wear rope tension, to ensure smooth picture.
  这几点细致到了吗?盼望大家肯定要细致,这关系到人们的生命安全。
  Have you noticed any of these? I hope you must pay attention to, it is related to the safety of people’s lives.
相关:大型 工地 正规 做法
上一篇:户外楼顶大字制作广告牌用的是什么材料
下一篇:清洗后的北京大型楼顶大字制作广告牌验收标准及细致事项
返回 亚博体育
北京远通广告有限公司
我们的观点 Our point of view
亚博体育以质量赢得生存、以诚实守信发展客户;坚持开拓进取、务实创新、用心做事、精益求精、互利双赢的经营理念;为客户提供高水准、专业化和可操作性的多元化服务,满足客户的实际要求
相关链接 news
北京大型楼顶大字制作广告牌讲解
北京大型楼顶大字制作广告牌庖代
对于北京大型楼顶大字制作广告牌
对北京大型楼顶大字制作广告牌进
清洗后的北京大型楼顶大字制作广
如何做大型楼顶大字制作广告牌制
怎样使北京大型楼顶大字制作广告
介绍选择大型楼顶大字制作广告牌
济南大型楼顶大字制作广告牌介绍
山东临沂高新城管局排查大型户外